A simplified view of this page’s public content. Your inputs and generated reports are never included.
Open this page as text · All public content
← All security tools (https://koksalkayali.com/tools/)
Free tool / 5–10 minutes
# BCP / RTO / RPO Assessment
Compare business recovery targets with stated recovery capability and identify gaps across critical processes.
Background reference: NIST contingency planning guidance (https://csrc.nist.gov/pubs/sp/800/34/r1/final). This independently authored tool does not verify your environment.
## Your inputs stay with you.
These tools run in your browser. Inputs are not sent to this site, stored in a database or saved in browser storage. No registration, cookies or paid API is needed. Keep your output using download or print before leaving.
Avoid secrets and unnecessary personal information. Hosting providers process normal technical request data to serve and protect the site. Read the privacy policy. (https://koksalkayali.com/privacy/)
Canonical page: https://koksalkayali.com/tools/bcp/
## Required information
- Organization / scope (required)
## Repeatable process entries (up to 20)
- Critical process / service (required)
- Process owner / role (required)
- Business impact of an outage (required)
- Maximum tolerable disruption (hours) (required)
The longest interruption the business can tolerate.
- Target RTO (hours) (required)
How quickly the process should resume. Include dependencies and validation.
- Target RPO (hours) (required)
Maximum acceptable data-loss window. Zero means no data loss is acceptable.
- Estimated achievable recovery (hours) (optional)
Leave blank if unknown. Include detection, restoration and validation.
- Maximum interval between recoverable data points (hours) (optional)
Leave blank if unknown. An interval alone does not prove recoverability; include replication lag.
- Critical systems, people and supplier dependencies (required)
- Slowest dependency recovery (hours) (optional)
Leave blank when unverified; include outsourced services.
- Have these recovery assumptions been tested? (required)
Choices: Yes; No; Not sure
- Is an alternative way of operating documented and tested? (required)
Choices: Yes; No; Not sure
- Recovery strategy / next actions (required)
Use the interactive page to generate a draft locally. This text view is not a submission endpoint.